Commissioning
15
Control and Distribution Systems
Series 8146/5
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
8
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect enclosure for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check whether the cables have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check whether all conductors have been clamped firmly.
• Check whether all covers and partitions for live parts have been installed and fastened.
• Seal the unused cable entries using plugs with a respective certification and unused
bores with stopping plugs certified for the respective type of protection.
• Check the tightening torques.
9
Operation
The control and distribution devices 8146/5 are installed in customer-specific
installations. The requirements during operation therefore depend to a large extent on the
operating conditions and the installation on site.
WARNING
Check the device before commissioning!
Explosion protection is impaired!
• Observe the inspection requirements in the current national
regulations before commissioning in order to maintain the
explosion protection.
• Check the device for proper installation and function before
commissioning.
NOTE
Also observe the further documentation such as the device list,
wiring diagram etc.
In order to ensure a correct operation, observe the documentation and the
instructions of the operating company!
Содержание 8146/03
Страница 2: ......
Страница 20: ...18 137193 8146620300 2014 06 26 BA00 III de 05 Steuerung und Verteilung Reihe 8146 5...
Страница 38: ......
Страница 39: ...18 137193 8146620300 2014 06 26 BA00 III en 05 Control and Distribution Systems Series 8146 5...
Страница 40: ......
Страница 41: ...137193 8146620300 2014 06 26 BA00 III de en 05...