
EN
23
3 .5 Installation on swing doors
Fig.4: Attach the process guard locking to the profi le at the
desired height and tighten the Torx screws M6 x 25 mm.
Fig.5: Attach the anchor plate to the mounting plate and
tighten the Torx screws M6 x 8 mm.
Fig.6: Attach the mounting plate with the anchor plate to
the profi le and align with the process guard locking. Tighten
the Torx screws M8 x 12 mm.
3 .6 Installation on sliding doors
Fig.7: Attach the process guard locking to the mounting
plate and tighten the Torx screws M6 x 25 mm.
Fig.8: Attach the mounting plate with the process guard
locking to the profi le and tighten the Torx screws M8 x 12 mm.
Fig.9: Attach the anchor plate to the profi le of the sliding
door and align it with the process guard locking. Tighten
the Torx screws M6 x 10 mm.
All screws used are Torx pan-head screws with countersunk pin (safety screws) and are tightened to 6 Nm.
See Section 11.1 for screws and mounting plate as additional equipment