Data di emissione:
January, 2019
Revisione:
2
Pag. :
33/60
- Reassemble the upper mixing unit (O) so that
its toothed crown is aligned with the lower
crown. This will allow the front pin to fit
perfectly into its fixed position on the bowl (see
figure 20).
- Remove the liquid-collector tray (AA) turning it
slightly upwards and pulling it forward (see
figure 21). Wash each part thoroughly, then
reassemble the parts by inversely following the
procedures described above.
- Plug the unit back into appropriate power
supply the machine is now ready to operate
again.
- Once cleaned, before starting up the machine
perform the sanitizing procedure as described in
the next page.
Fig. 20
Fig. 21