54
• Mark the holes to be drilled for the fixing spacers. For a handrail height
of 900 mm (measured at the handrail's upper surface), the drilling height
is 800 mm.
• Drill the holes marked on the wall. Insert the plugs.
• Fix the rail with its fixing spacers, starting at each end (the PVC sheathes
have not yet been installed as shown in the diagram).
• Clip the "upper" PVC sheath and then the "lower" PVC sheath.
INSTALLING ESCORT’DUO AND LINEA’DUO
HANDRAILS