10
STEP 5
1.
Gather
HARDWARE FOR STEP 5.
2.
Take the LEFT CONNECTING ARM (9) and slide the axle through the rotation tube on the
left pedal arm.
3.
Secure the LEFT CONNECTION ARM (9) in place with the 5-WAY PIPE FIXING PLATE
(15) and 3 KEY HEAD SOCKET BOLTS (91).Tighten with the 5mm L WRENCH.
4.
Line up the socket joint at the end of the pedal arm to the bracket on the bottom of the
swing arm. Secure together with the BOLT (90) WASHER (106) and NUT (87). Tighten
with the 13/14 WRENCH and the 12/14 WRENCH.
5.
Repeat these steps on the right side.
HARDWARE
#106.
5/16" × 20 × 1.5T
Flat Washer (2 pcs)
#90.
5/16" × 1- 1/4"
Hex Head Bolt (2 pcs)
#87.
5/16" × 9T
Nyloc Nut (2 pcs)
#91.
M8 ×15m/m
Button Head Socket
Bolt (6 pcs)
Содержание 161173795US
Страница 32: ...32 Exploded View Diagram...