SPINOGY Xcontrol-E Скачать руководство пользователя страница 6

01 GENERAL REMARKS

 

01

 

General remarks 

01.1

 

Notice 

 

This operating manual contains important information about handling the product. It has to be read carefully 

before use. The Xcontrol-E may only be put into operation if the operating manual was understood completely. 

If there are obscurities, SPINOGY must be contacted. Please follow the instructions of this operating manual. This 

operating manual must be available for the user at any time and must be replaced in case of loss or impracticality 

immediately. The obligation to retain applies as long as someone is in possession of the product. 
 

The  content  of  this  operating  manual  is  checked  for  conformity  with  the  described  incomplete  machine,  but 

deviations and mistakes cannot be excluded. Technical and content-related changes, errors and misprints are 

reserved. 

 

This operating manual is subject to the copyright law and may not be reproduced, copied or changed in any form, 

neither  all  nor  part, without  the permission of  the author.  In case of contravention, there is a risk of criminal 
prosecution. All rights reserved. 
 

01.2

 

Limitation of liability 

 

SPINOGY doesn’t assume liability for personal injuries, material damages, damages caused to the device and 

consequential damages caused by failure to follow this operating manual, improper use of the device, repairs or 

any other actions done by non-qualified workers (See chapter 2.3 personnel requisition) damages on this unit 
occur or occurred by using unauthorized non-approved spare parts. Non-compliance of maintenance intervals 

and maintenance specification of the manufacturer does also lead to limitation of liability. (Please see chapter 7 

 maintenance) In addition, it is strictly prohibited to make any unauthorized modifications or technical changes 

on the device.  

 
 

01.3

 

Product name 

 

This operating manual is created for the following product:  

 

Product name:

  

Xcontrol-E, Xcontrol-E DIY 

Compatible 

with 

spindle: 

XP001,  XP002,  XP003,  XP004,  XP005,  XP006,  XP007,  XP008,  XP021,  XP022, 
XP023, XP024 (as well as all configurations of these spindles)  

 
 

01.4

 

Labeling of Xcontrol-P 

 

 

 

X X X X X X 

The  Xcontrol-E  is  labeled  with  a  six-digit  serial  number.  The  serial 

number is located on the upper-left side of the door, pursuant to the 

following picture.  

 

Using  this  serial  number,  all  necessary  information  about  the 

Xcontrol-E can be obtained from SPINOGY at any time.  

Содержание Xcontrol-E

Страница 1: ...OPERATING MANUAL Xcontrol E...

Страница 2: ...spinogy de...

Страница 3: ...ties of the operator 02 5 Modifications and unauthorized changes 02 6 Special hazard warnings 8 8 8 10 10 10 03 Transport packaging and storage 11 03 1 Transport 03 2 Packaging 03 3 Storage 11 11 11 0...

Страница 4: ...nce 07 2 Spare parts 26 26 08 Disassembly and disposal 27 08 1 Disassembly 08 2 Disposal 27 27 09 Service and repair 28 09 1 Service and repair authorized users 28 10 Warranty 29 11 Declaration of ins...

Страница 5: ...and the operating manual We therefore ask you for your understanding that no claims can be derived from technical data illustrations or descriptions During the development of this equipment we have al...

Страница 6: ...01 2 Limitation of liability SPINOGY doesn t assume liability for personal injuries material damages damages caused to the device and consequential damages caused by failure to follow this operating...

Страница 7: ...y de Phone 49 6150 970 960 Website spinogy de 01 6 Target group This operating manual is primarily aimed at the following staff Installation staff Machine operators Maintenance staff 01 7 Lifecycles o...

Страница 8: ...al damage The following signal words are used SIGNAL WORD MEANING DANGER Danger with a high risk level that will result in death or serious injury in case of non observance WARNING Danger with a mediu...

Страница 9: ...workplace For this purpose they must be informed about the possible hazards resulting from the tasks assigned to them In addition they should recognize the purpose of the occupational safety and healt...

Страница 10: ...he Xcontrol E is always in a technically perfect condition Compliance with maintenance intervals Creating of operating instructions Creating of hazard assessments Training and instruction of authorize...

Страница 11: ...and other external influences such as corrosion The packaging should therefore only be removed shortly before assembly In addition the packaging should be kept if possible to protect Xcontrol E in cas...

Страница 12: ...of spindle manual or semi automatic automatic Cooling method spindle liquid cooled air cooled liquid cooled air cooled Frequency inverter 2 2 kW SVC 230 V Power supply V 230 1 phase Braking resistor...

Страница 13: ...ase SVC 70 600 W 10 s 2 ED 2 2 230 1 phase HF 70 600 W 10 s 2 ED 2 2 400 3 phase SVC 200 600 W 10 s 2 ED 2 2 400 3 phase HF 200 600 W 10 s 2 ED Cable length Motor connection m Sensor connection m PE P...

Страница 14: ...14 04 TECHNICAL DESCRIPTION 04 2 Components The following picture shows the main components of the Xcontrol E View door...

Страница 15: ...15 04 TECHNICAL DESCRIPTION View inside View connection ports...

Страница 16: ...t voltage V 24 Nominal current A 2 5 Ambient temperature C 40 70 C Safety relay Power W Maximum 4 Supply voltage V DC 24 Direct switching outputs 2 normally open Output with switch off delay 2 normall...

Страница 17: ...DESCRIPTION Emergency stop Maximum switching voltage V AC 240 Maximum switching current A 6 Contact type 2x Normally closed Ambient temperature C 25 to 55 Function Locking Release type Rotary release...

Страница 18: ...mmediately 05 2 Completeness check The content of the consignment must be checked for completeness If any parts are missing contact SPINOGY Scope of delivery Xcontrol E Key for the door of the Xcontro...

Страница 19: ...07 Optionally Connect the Xcontrol P signal cable to the terminals 08 Optionally Connect the Xcool signal cable to the terminals 09 Check whether the main switch is set to 0 Off 10 Check whether the c...

Страница 20: ...ncoder NZ X1 31 Pin 11 Signal rotational speed oder Encoder PA X1 32 Pin 12 Encoder NA X1 33 Pin 13 Encoder PB X1 34 Pin 14 Encoder NB X1 35 Pin 15 Encoder Vcc 5 V X1 36 Pin 16 X1 37 PE Optional 24 V...

Страница 21: ...ive earth conductor must be connected as follows Connecting motor connection cable and sensor connection cable The connection of the motor supply cable and the sensor connection cable to the spindle c...

Страница 22: ...1 36 Encoder Vcc 5 V X1 37 X1 38 Optional Xcontrol P valve X1 39 0 to 10 V spindle rotational speed X1 40 0 V spindle rotational speed X1 41 0 V start signal spindle X1 42 Relay output Xcontrol E to m...

Страница 23: ...below the required level For integration of the valve see wiring diagram below The connection cable of the Xcontrol P needs to be inserted into the Xcontrol E Pin 1 of the cable must be inserted to t...

Страница 24: ...tegrated into the safety circuit so that in the event of a temperature or flow error the emergency stop is activated and the spindle is stopped For integration of the Xcool see wiring diagram below Ou...

Страница 25: ...rn After completing this process check the following points 07 Start via machine control 08 Stop via machine control 09 Emergency stop by activating the emergency stop switch 10 Emergency stop via ext...

Страница 26: ...tractors and relays for wear or damage Check connecting lines and cables for damage and fastening Check for dirt or corrosion Check switching operation and control operation Clean fan filter and check...

Страница 27: ...Activate the emergency stop of the machine or system if separate to the Xcontrol E c Set the main switch of the machine or system to 0 or Off d Secure the machine or system against unauthorized resta...

Страница 28: ...d repairs are carried out any warranty and guarantee claim expires and SPINOGY is not liable for any resulting damage to property or personal injury WARNING Repairs by operators or third parties are n...

Страница 29: ...operty of SPINOGY unless SPINOGY expressly waives such right 06 For all necessary rework and replacement deliveries the buyer has to set an appropriate period after consulting SPINOGY If this is not t...

Страница 30: ...een determined that the machine into the partly completed machine is to be installed complies with the purpose of the Machinery Directive 2006 42 EC and the EC Declaration of Conformity according to A...

Страница 31: ...31 11 DECLARATION OF INSTALLATION SPINOGY GmbH Rev 04 2022...

Отзывы: