![SPINOGY Xcontrol-E Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/spinogy/xcontrol-e/xcontrol-e_operating-manual_1347836018.webp)
18
05 INSTALLATION
05
Installation
05.1
Transport damages check
The entire delivery must be checked for transport damage after acceptance. In case of external damage to the
packaging, this must be documented. After unpacking the SPINOGY X22 and the additional scope of delivery,
the products must be checked directly for transport damage. In case of damage to the products, this must be
documented. Despite the greatest care in packaging and shipping our products, transport damage may occur as
a result of improper handling or force majeure in transit. Defective or damaged products must not be put into
operation. The products must always be used in perfect condition.
If transport damage is detected or if there are any questions, SPINOGY must be contacted immediately.
05.2
Completeness check
The content of the consignment must be checked for completeness. If any parts are missing, contact SPINOGY.
Scope of delivery:
• Xcontrol
-E
•
Key for the door of the Xcontrol-E
05.3
Installation of the Xcontrol-E
The installation of the Xcontrol-E may only be carried out by qualified staff. During all work, the locally applicable
occupational safety and accident prevention regulations as well as internal company regulations must be
observed and complied with. Suitable tools must be used for the installation.
WARNING: Unauthorized staff
Unauthorized employees are not aware of the hazards in the respective work area. Failure
to comply with the personnel requisition can result in serious injury or even death.
WARNING: Falling parts
During installation, components may fall, resulting in serious injury and property damage. It
is recommended to work at least in pairs and to wear protective equipment and use
appropriate tools.
Содержание Xcontrol-E
Страница 1: ...OPERATING MANUAL Xcontrol E...
Страница 2: ...spinogy de...
Страница 15: ...15 04 TECHNICAL DESCRIPTION View inside View connection ports...
Страница 31: ...31 11 DECLARATION OF INSTALLATION SPINOGY GmbH Rev 04 2022...