10
9.
Installation
9.1.
Safety
Vorsicht
Risk of injury
Users can be injured by damaged components.
►
Do
not
install the charging station:
–
Near flammable materials
–
In areas with explosion hazards
–
In salty or wet environments
–
In the vicinity of aggressive vapours
–
In environments subject to constant vibration
Examples of these environments of include petrol station forecourts, chemical plants, waste
disposal sites and sewage plants.
Achtung
Risk of damage due to weather conditions
Incorrect choice of location can damage the charging station.
►
Do not expose the charging station to any heat sources (such as sunlight or heaters).
►
Install the charging station in a location protected from rain and splashing water (for
example, in a protected outdoor area, Fig. 1).
Risk of damage from drilling
Damage can be caused by badly executed drilling.
►
Before drilling holes in the wall or mounting surface, make sure that this will not damage
any electrical cables or other lines.
9.2.
Prerequisites
The following equipment must be provided on site to protect the wallbox:
Pre-fuse with a maximum rating of 16 A. The manufacturer recommends:
•
230 V:
Miniature circuit breaker (C characteristic); 1-pole
•
400 V:
Miniature circuit breaker (C characteristic); 3-pole
Residual current device RCD Type A with I
Δ
n
≤
30 mA
•
230 V:
Residual current circuit breaker, 2-pole
•
400 V:
Residual current circuit breaker, 4-pole
Depending on the installation location: Overvoltage protection device according to national and regional
regulations.
Observe the following when choosing the installation location:
Always mount the wallbox upright (e.g. on building walls).
The mounting surface must be level and sufficiently strong. If there is unevenness on the wall of more
than 2 mm, compensation is required under the mounting points to prevent the enclosures from
warping.
The fastening material used must be suitable for the mounting surface.
There must be at least 250 mm free space around the wallbox. This includes plant growth.
Spelsberg recommends keeping a sufficient distance to other obstacles in the installation area.
The bottom of the wallbox must be at least 900 mm above the ground.
The wallbox must always be sufficiently lit during operation. Install lighting if necessary.
Содержание Wallbox Pure
Страница 1: ...safe inspiring green Product manual Wallbox Pure Wallbox Smart Pro Wallbox Pure Smart Pro ...
Страница 38: ...38 ...
Страница 39: ...39 ...