XRBHR/XRBD SERIES MONOBLOCK® MANUAL
20
118185-001 REV B
X-RAY TUBE RE-SEASONING PROCESS
For
XRBD160PN210
Parameters
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12
Voltage (kV)
80
90
100
110
120
130
140
150
160
165
140
100
Current (mA)
0.3
0.45
0.55
0.65
0.75
0.85
1.0
1.1
1.25
1.25
1.5
2.1
For units with idle
time greater than
30 days
20 min 20 min 20 min 20 min 20 min 20 min 20 min 20 min 20 min
20 min
20 min
20 min
For units with idle
time of 14-30 days
5 min
5 min
5 min
5 min
5 min
5 min
5 min
5 min
5 min
5 min
5 min
5 min
For units with idle
time of 7-14 days
60 sec 60 sec 60 sec 60 sec 60 sec 60 sec 60 sec 60 sec 60 sec
60 sec
60 sec
60 sec
For units with idle
time of 1-7 days
30 sec 30 sec 30 sec 30 sec 30 sec 30 sec 30 sec 30 sec 30 sec
30 sec
30 sec
30 sec