6
In
stallation Basics
Read the directions!
Avoid ti
ght hose bends and excessive runs.
U
se heavy gauge w
ire.
Install feed pump as
low as pos
sib
le.
U
se a dedicated thru
-
hull with scoop type strainer.
Thru
-
hulls
It
is
mandatory
that
a
d
edicated
3/4
”
to
1”
forward
facing
scoop
type
intake
thru
-
hull
and
seacock
b
e
installed.
Install
the
intake
for
the
system
close
to
the
middle
and
as
far
below
the
water
line
as
possib
le.
Thru
-
hu
ll
s
in
the
bow
area
are
suscep
tible
to
air
intake
in
rou
gh
conditions.
Sharin
g
a
thru
-
hul
l
w
ith
another
system
is
not
accep
table
and
will
vo
id
the
war-
ranty.
Sharin
g
a
thru
-
hull
can
introduce
unforese
en
problems
such
as
intermittent
flow
re-
striction,
air
bubb
les,
and
contam
inates.
For
racin
g
boats
and
hi
gh
speed
power
boats
above
15
knots
a
r
etra
ctable
snorkel
-
type
thru
-
hull
fitting
is
preferred
to
b
e
able
to
pick
up
w
ater
away from the hull.
Do
not
install
the
intake
close
to
or
downstream
of a
head
discharge.
Install
as
far
below
the
waterline and as close to center line as possib
le to avoid contamination and air induction.
The brine di
scharge through
-
hu
l
l shou
ld be mounted above the waterline, in or just above the
boot stripe to min
im
i
ze water lift.
Double clamp a
ll ho
se connections below the waterline.
Pi
pe Fitting Instruction
Plastic
to
plastic
fitting
s
shou
ld
have
3
to
4
wraps
of
Teflon
tape
and
will
thread
almost
al
l
the way in.
Avoid
getting
dirt
or
debr
is
into
the
piping
or
hoses
during
assembly.
A s
mal
l b
it of de-
bris
can
stop
th
e
system!
Avoid
gettin
g
tape
ov
er
the
end
of
fittings
that
might
get
into
the
system. To ensure thi
s does not happen, leave the v
ery first thread un
coat
ed.
Avoid
restrictions
or
lon
g
runs
on
the
entire
inlet
side
of
the
plumbin
g
fro
m
the
thru
hull
to
the main feed pump modu
le.
Preven
t
tight
bends
and
ex
cessive
elbows.
Any
restrictions
w
i
ll
ha
mper
system
performance.
Secure the pipin
g
away from
mov
in
g ob
jects such as en
gine belts
and hatches. Preven
t chafe
on
the
tubing
as
required.
Test
and
inspect
al
l
p
ipin
g
and
hose
cla
mps
after
several
hours
of
operation.
Flow
W
iring
Pay a
tten
tion to wire si
ze or system perfor
mance wil
l be i
mpaired.
Perform wirin
g to
UL, AB
YC, CE or applicable standards.
Thru
- hull
Not Supplied.
Содержание NEWPORT 400 Mk II
Страница 2: ...2 ...
Страница 15: ...15 John Guest Super Speedfit ...
Страница 22: ...22 ...
Страница 49: ...49 Z BRANE OPERATION MANUAL ...
Страница 53: ...53 ...