10
INSTALLATION
Control System Overview
Main Breaker
Service Switch
Connecting the Spectra Connect control
board to an Ethernet Switch or a LAN port on
your wireless router will allow the system to be
controlled from any mobile device.
Initial power
-
up
When power is first applied to the unit the main
breaker (Emergency Shut
-
Off) should be in the off
position. The Service toggle switch should be in
the off position.
The Run toggle switch on the speed control
should be in the Auto position for both the main
pump and the optional boost pump.
Note this is Three way Toggle Switch:
Up—AUTO
Middle—OFF
Down—Manual
Содержание LB-1800C
Страница 2: ...2 Page Intentionally blank...
Страница 4: ...4 Page Intentionally blank...
Страница 33: ...33 Black Parker tube fittings...
Страница 34: ...34 John Guest Super Speedfit Fittings...
Страница 48: ...48...
Страница 49: ...49...
Страница 50: ...50...
Страница 51: ...51...
Страница 52: ...52...