![Speck BADU Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/speck/badu/badu_translation-of-original-operation-manual_1341743048.webp)
Installation
16 EN
08|2018
5 Installation
5.1 Installation
site
5.1.1 Outdoor
installation
In order to increase the pump's service life, provide simple
weather protection.
5.1.2 There
must
be ground drainage
Calculate the size of the ground drain according to the
following criteria:
– Size of the swimming pool.
– Circulation
flow
rate.
5.1.3 Ventilation
and
aeration
Ensure sufficient ventilation and aeration. The ventilation and
aeration must ensure the following conditions:
– Prevention of condensation.
– Minimum
distance
from
fan
cover to the wall: 50 mm.
– Cooling of the pump motor and other system components,
for example switch cabinets and control units.
– Limitation of the ambient temperature to maximum 40 °C.
5.1.4 Structure-borne
and
airborne noise transmission
Observe regulations for structural noise protection, for
example DIN 4109.
Install the pump in a manner which reduces structure-borne
and airborne noise transmission. Vibration-absorbing
materials are suitable bases. Examples:
– Anti-vibration
buffers
– Cork
lining
– Sufficiently
hard
foam
5.1.5 Reserve
space
Provide enough reserve space to remove the motor unit
backwards from the pump in the direction of the motor fan
and the strainer basket upwards. See dimensional drawing in
the pump data sheet.
5.1.6 Fasteners
Fasten pump using screws.