![Speck pumps 1.1 THP Dual Voltage Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/speck-pumps/1-1-thp-dual-voltage-series/1-1-thp-dual-voltage-series_installation-operation-and-service-manual_1341838010.webp)
10
Pressure Test - continued
STEPS:
1. Fill the system with water, using care to eliminate trapped air.
2. Pressurize the system with water to no more than 35 PSI.
WARNING:
DO NOT pressure test above 35 PSI. Pressure testing must be done by a trained pool professional. Circulation
equipment that is not tested properly might fail, which would result in severe injury or property damage.
3. Close the valve to trap pressurized water in the system.
4. Observe the system for leaks and/or pressure decay.
5. If there are leaks, repeat Steps 1 -3.
For technical support, call 800-223-8538. If calling from outside the U.S. dial +1
904-739-2626.
CAUTION:
Never run the pump without water. Running the pump “dry” for any length of time can cause severe damage to
both the pump and the motor and will void the warranty.
If this is a new pool installation, make sure all piping is clear of construction debris and has been properly pressure tested.
The filter should be checked for proper installation, verifying that all connections and clamps are secure according to the
manufacturer’s recommendations.
WARNING: To avoid risk of property damage, severe personal injury or death, verify that all power is turned off before
starting this procedure.
1. Release all pressure from the system and open the filter pressure release valve.
2. Depending on the location of the pump, do one of the following:
4
Operation
Start Up Guide
If the pump is located below the water level of the pool, open the filter pressure valve to prime the pump with
water.
If the pump is located above the water level of the pool, remove the lid and fill the basket with water before
starting the pump.
3. Prior to replacing the lid, check for debris around the lid o-ring seat. Debris around the lid o-ring seat will make it difficult
to prime the pump.
4.
Hand-tighten
the lid to make an air tight seal.
DO NOT
use any tools to tighten the lid:
hand-tighten only.
Make sure all
valves are open and the unions are tight.
5. Once all the air has left the filter, close the pressure release valve.
6. Switch on power to the pump-motor. When turning on for the first time, it will be in the stopped position (OFF shown on
display). Press the OK button to start the pump and it will begin running on the 24-hour schedule.
7. The pump will run through the priming cycle when you first start the 24-hour scheudle. Default priming cycle is 2 minutes
at 1000 watts (2850-3500 RPM). Priming power level is adjustable from 10 watts (400-600 RPM) to 1000 watts (2850-
3500 RPM) in increments of 10 watts, and priming time is adjustable from 0-10 minutes in 1 minute increments.
n
n
Содержание 1.1 THP Dual Voltage Series
Страница 27: ...27...
Страница 28: ...2999999406 Rev 0717...