1
G
5
F
D
6
B
C
3
A
2
E
4
BATTERY ROCK GUARD & BATTERY CHARGE PORT DOOR
# PART NAME
PART NUMBER QTY
SPEC
TOOL
TORQUE
COMMENT
Nm
in-lbf
A Rock Guard
1
N/A
N/A
N/A
ROCK GUARD AND CHARGE PORT DOOR ASSEMBLY PROCESS:
1: Insert the battery sleeve into the hole at the base of the battery.
2: Assemble the rock guard onto battery.
3: Insert the rock guard mouting bolt and washer, then torque to specification.
4: Assemble the battery door on the battery making sure it is located in the hole on the top of the battery.
5: Insert the battery screws and torque to specification.
NOTE: The lower battery screw will need a 3 mm long reach hex bit to torque the bolt correctly.
Battery bolt is available as a standalone part
B Rock Guard Mouting Bolt
1
M5 x 65 mm x 0.8 mm p,Alu
3 mm hex
3
26
C Rock Guard Mouting Washer
1
M5 x 5.2 mm ID x 8 mm OD x 1 mm Thk,
Alu
N/A
N/A
N/A
D Battery Bolt
1
M12 x 20 mm x 1.25
6 mm hex
6.2
55
E Charge Door
1
Charger Door Kit:
N/A
N/A
N/A
F Charge Door Bolts
2
M3 x 8 mm x 0.5 mm p - S-Steel
2.5 mm hex
0.8
7
G Battery Sleeve
1
N/A
N/A
N/A
H Battery
98921-5614
1
700 Wh (Includes Rock Guard)
N/A
N/A
N/A
PAGE
34
2022
TECHNICAL GUIDE
Содержание LEVO 2022
Страница 1: ...SCHEMATIC SMALL PARTS 2022 TECHNICAL GUIDE...