Spearhead Star-Cut
910/1210
Every 8 Hours
•
Dismantle and clean the main input P.T.O shafts sliding surfaces and re-
grease; failure to do this will result in serious damage to the splitter gearbox.
•
Grease all universal joints, (Fig. 10) paying particular attention to the constant
velocity joint. If under-greased this constant velocity joint will soon fail.
•
Grease the wing drive shaft tubes, (note the hole in the plastic tubing for
access).
•
Lubricate the retaining collar on all the drive shaft guards (Fig. 10).
•
Grease PTO inner tube and push pins (Fig. 10).
•
Check all bolts are tightened to the correct Torque (Fig.11).
Torque Settings
The Torque figures given below are recommended maximum settings only.
Size:
Tensile strength:
Description:
Torque setting:
Nm.
M16
8.8
Gearbox bolts
280
M20
8.8
Blade bolts
425
M24
8.8
Blade bolts
730
Wheel nuts
270
•
For maximum life and performance, the CV body must be greased regularly. Lubricate
with the driveline in a straight position - up to 30 pumps of grease may be required.
•
The metal drive tubes must be greased to operate properly.
•
Shielding is subject to damage from abuse and weathering. Replace all damaged
components and all shielding removed during maintenance.
•
Do not use PTO adapters with CV drivelines. Replace special taper pin bolts only with
genuine OEM parts, periodically check tightness of nuts.
Fig. 10
Primary input shaft
24
Содержание Starcut 1210
Страница 20: ...Spearhead Star Cut 910 1210 Transportation 20 ...