background image

Spearhead

 

Multi-Cut 

420

 

 

10

 

 

Operation 

 

Once ready for work with the wings unfolded, raise the mower clear of the ground 
and slowly engage the PTO with the

 

tractor engine at low revs to prevent shock 

damage to the machine. Slowly increase the engine revs to achieve the 
recommended PTO speed of 1000r.p.m. As indicated by the decal on top of the 
centre guard and not the number of splines on the P.T.O shaft. Lower the machine 
onto the ground, select a sensible forward speed bearing in mind the density of 
growth, the terrain, the available horsepower and proceed. If at any time serious 
vibration occurs, 

stop the engine immediately and check the blades, following all 

safety precautions

 
The quality of finish is determined by the forward speed, i.e. a slow speed will 
produce a high quality of cut, where as faster forward speeds are used when high 
output is first priority. 
 
When in work, always ensure the hydraulic spool valve that operates the folding of 
the wings is in float position to enable the wings to freely follow all contours of ground 
(Fig. 5). 

 
 
 
 
 
 
 
 

 
 
 
Whilst mowing it is possible to continue working when turning the 420 Rotary Cutter 
on the headlands, however we recommend the machine is slightly raised to prevent 
the skids marking the ground and reduce the wear on the skids.

 

 

When operating in confined areas it is possible to cut going backwards, but it is 
advisable to slightly raise the machine, particularly if in scrub, where there is the risk 
of hitting hidden solid obstacles obscured by dense undergrowth. 
 
Always exercise particular care when operating over uneven ground surfaces. Do not 
allow the blades and blade holder to frequently hit the ground. 
 
Do not allow debris to build upon the cutting decks in dry conditions, as this can be a 
fire hazard, in wet conditions it will place unnecessary strain on the machine and may 
foul the drive shaft causing damage.

   

Fig. 5 contours of the ground 

Содержание Multi-Cut 420

Страница 1: ...hine it relates to please contact the After Sales Department for advice Spearhead Machinery Limited 2007 Please ensure that this manual is handed to the operator before using the machine for the first...

Страница 2: ...e Manufactured by the above company complies with the required provisions of the directive 89 392 EEC 98 37 EC and 98 38 EC and AMD 91 368 EEC AMD 93 44 EEC AMD 93 68 EEC and conforms with European no...

Страница 3: ...7 Attaching to the Tractor 7 8 Setting up your Machine 9 Operation 10 Transportation 11 Machine protection 12 Servicing Maintenance Safety First 13 Daily 14 Every 8 Hours 15 Torque Settings 15 Regula...

Страница 4: ...ong as the engine is running Warning Stay clear of mower blade as long as engine is running Warning Stay clear of swinging area of implements Warning Shut off engine and remove key before performing m...

Страница 5: ...no damaged or loose parts Particular attention should be given to the blades to ensure they are not damaged cracked or missing Inspect work area for wire steel posts large stones and other dangerous...

Страница 6: ...fication Never use a machine if the hydraulic system shows signs of damage Never attempt to detect a hydraulic leak with your hand use a piece of card Never allow children to play on or around the mac...

Страница 7: ...P T O One external hydraulic service required single acting with float facility for wings Attaching To The Tractor Fit the machine to the tractor in the standard way ensuring the correct match of link...

Страница 8: ...s The PTO shaft is fitted with a non rotating safety guard It should be secured to the machine and tractor with the two retaining chains provided Connect the hydraulic hose to a single acting service...

Страница 9: ...ink arms are fully raised Wings Unfolding the wings if the machine is in the transport position first pressurise hydraulic rams before releasing locking bar Fig 4 lower both wings by releasing hydraul...

Страница 10: ...t is first priority When in work always ensure the hydraulic spool valve that operates the folding of the wings is in float position to enable the wings to freely follow all contours of ground Fig 5 W...

Страница 11: ...ight and secure rams with locking bar Fig 6 Never transport along public highways with the wings only supported by the hydraulics Please observe Public Highway Regulations concerning the towing of imp...

Страница 12: ...7 as this could result in severe damage to the gearbox and drive lines as well as invalidating the warranty If the machine has been laid up for any length of time there is a risk of the clutch plates...

Страница 13: ...out in order not to invalidate your warranty these are carried out before the first operation after the first hour then after 4 hours These checks are 1 Wheel nuts and tyre pressure 40psi 2 Gearbox bo...

Страница 14: ...k wheel nuts are tight Check tyre pressures 40 P S I Check gearbox lubrication replenish as necessary to the correct level line on the dipstick provided with each gearbox Fig 8 Lubrication points A Wi...

Страница 15: ...given below are recommended maximum settings only Size Tensile strength Description Torque setting Nm M16 8 8 Rotor gearbox bolts 280 UNC 8 8 Splitter gearbox 280 M24 8 8 Blade bolts 950 Wheel nuts 27...

Страница 16: ...t Blades Caution When carrying out maintenance work on or near the blades be careful of free swinging blades over centering and falling It is recommended that protective clothing including hardhat and...

Страница 17: ...n and store clutch assembly in a dry place Check condition of friction linings and reset spring compression to original height before use Should the assembly overheat due to frequent or prolonged clut...

Страница 18: ...r nuts which are painted red for danger when removing the wheel The outer nuts must not be loosened until the valve has been removed and the inner tube is entirely deflated Then and only then may the...

Страница 19: ...y cloth remove all traces of rust on the metal clutch plates Check condition of the friction plates if there is any sign of over heating wear or cracking replace with new Do not attempt to use the mac...

Страница 20: ...t enough overlap 6 Lack of grease 7 Build up of Debris under drive shaft Gearbox Overheating 1 Incorrect oil grease level 2 Incorrect grade of oil grease 3 Incorrect operating speed 4 Machine overload...

Страница 21: ...ns top links ball ends unless there is a manufacturing or material defect or the cost of normal servicing items such as oils and lubricants 5 This warranty does not cover any expenses or losses incurr...

Страница 22: ...iversary of the date of sale and the Service Report form must have been completed and stamped by the servicing dealer or Spearhead Service Engineer and sent to Spearhead within 14 days after the first...

Отзывы: