Chapter 4
Connecting the Domain to the Network
4-3
4.3
Verifying the Network Connection
This section explains how to verify the user network connection made as described
in
Section 4.2, “Connecting to the Network” on page 4-2
.
1. Set the mode switch on the operator panel to the Service position.
2. Press the Power button on the operator panel to power on the server.
3. Confirm the status of the LINK SPEED LED (see
FIGURE 4-2
) of the connected port
as described in
Section 4.2, “Connecting to the Network” on page 4-2
.
■
When amber is lit, the communication speed of LAN port is 1G bps.
■
When green is lit, the communication speed of LAN port is 100M bps.
■
When it is off, the communication speed of LAN port is 10M bps.
FIGURE 4-2
Location of LINK SPEED LED
4.4
Starting the Oracle Solaris Operating
System
Start the Oracle Solaris Operating System, as described in this section.
When performing this operation after the operations in
Section 4.3, “Verifying the
Network Connection” on page 4-3
, start from Step 5.
Note –
Oracle Solaris OS is pre-installed in the hard disk drive (HDD) of slot#0.
When you start Oracle Solaris OS from this HDD, a message appears to configure
the Oracle Solaris OS in line with the environment in use.
1. Set the mode switch on the operator panel to the Service position.
LINK SPEED LED
GbE port on the rear panel
Содержание Enterprise M3000
Страница 4: ......
Страница 8: ...viii SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Страница 34: ...3 14 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Страница 42: ...4 8 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Страница 60: ...B 10 SPARC Enterprise M3000 Server Installation Guide March 2012 ...