Plan Communication With the Server Module During Installation
Preparing for Installation
23
The connection methods are shown in the figure and described in the table. Obtain the cables,
monitoring devices, addresses, and passwords required for the method you choose.
Method
Connection Description
Connection Requirements
1
Ethernet
From:
CMM NET MGT port
To:
Your network
■ Know the IP address of the CMM.
■ Know the CMM Oracle ILOM user and password account information.
Use one of these procedures based on the type of Oracle ILOM interface you want to
use:.
■ Web Interface –
“Power On the Host Through the CMM SER MGT Port
■ CLI –
“Power On the Host Through the CMM (CLI)” on page 37
.
2
Serial
From:
Server module SP UCP port
To:
Terminal device
■ A terminal device and serial cable.
■ Dongle cable
You communicate directly with Oracle ILOM on the server module SP using the CLI.
See
“Power On the Host Through the Front Panel (CLI)” on page 39
.
3
Serial
From:
CMM SER MGT port
To:
Terminal device
■ A terminal device and serial cable
■ Know the CMM Oracle ILOM user and password account information.
You communicate through the CMM using the Oracle ILOM CLI. See
Host Through the CMM (CLI)” on page 37
.
.
Содержание E35202-05
Страница 1: ...Part No E35202 05 May 2014 SPARC T5 1B Server Module Installation Guide ...
Страница 2: ......
Страница 8: ...8 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 14: ...14 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 18: ...18 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 28: ...28 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 34: ...34 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 58: ...58 SPARC T5 1B Server Module Installation Guide May 2014 ...
Страница 62: ...62 SPARC T5 1B Server Module Installation Guide May 2014 ...