16
7. Do not install where the heat pump is likely to be subjected to polluted air, dust or
debris etc.
8. Avoid directing fan output against the dominant wind directions.
9. Protect the heat pump from possible snow fall.
10. Minimise exposure to environmental conditions as much as
possible and never block the airflow.
11. Ensure the heat pump is installed in an area that is free from
flammable and corrosive chemicals, and grease.
5.3 Installation of Water Pipes
Glued Union Fittings:
1. Ensure both tail piece and locking ring are screwed/fitted to the heat pump
and tightened before gluing water pipe to union tail. This will ensure the tail piece has
an even seal against the o-ring.
2. Use PVC priming fluid on end of water pipe and union tails before gluing. Once primed
glue pipes into place and ensure pipes are running straight and square into heat pump.
IMPORTANT:
Ensure the pipe work running from the heat pump to the spa pool
is supported. DO NOT have long runs of pipe in mid-air above the ground without
support. Ideally return the pipes to ground level as they exit the heat pump to ensure
the pipe work is self-supporting.
NOTE: Once the pipe work is full of water it will become heavy and will place strain
on the heat pump outlets if the pipe work is not supported. In the case of glued union
fittings, if the pipe work is unsupported the strain could cause stress damage to the
outlets and potential leaks.
IT IS THE INSTALLER’S RESPONSIBILITY TO ENSURE
THE PIPE WORK IS ADEQUATELY SUPPORTED AND RESTRAINED TO PREVENT
MOVEMENT AND STRESS.
Содержание Power Smart SHP-100
Страница 23: ...23 ...