
www.spacemanusa.com
Phone: (720) 328 - 1020
Email: [email protected]
www.spacemanusa.com
Phone: (720) 328-1020
Email: [email protected]
Routine Maintenance
WARNING: If this is the first time operating the machine, you MUST clean
and sanitize ALL parts prior to running the machine.
Routine Maintenance Operations:
Clean and Lubricate:
Daily
Replace Wearable Parts: Every 1 to 3 months*
Internal Cleaning:
Quarterly**
* Based on machine usage and cleaning intervals; a Tune-Up Kit is available
with all wearable parts (O-rings, gaskets, etc.) except scraper blades
** Based on cleanliness of location and proximity to powder-based machines
For optimal machine performance and many years of efficiency and
reliability from your machine, Spaceman USA recommends cleaning and
sanitizing the machine and its parts daily. The machine comes equipped
with a brush kit specifically designed to efficiently and properly clean the
machine.
IMPORTANT: Cleaning and sanitizing schedules are governed by state or
local regulatory agencies and MUST be followed accordingly. Routine
maintenance MUST be performed a minimum of once every 3 days.
CAUTIONS:
Do NOT run the machine without properly lubricating required parts.
Do NOT clean the machine with abrasive or toxic chemicals and
cleaners. Doing so may cause damage to the stainless steel material.
ONLY use Spaceman-USA-included cleaning brushes and lubrication.
NEVER use metal objects to clean or operate the machine.
ALWAYS replace wearable parts a minimum of every 3 months.
ALWAYS prime machine prior to operating.
ALWAYS inspect parts for excess wear and damage.
NOTE: Additional brushes, lubrication, wearable parts, and tools can be
purchased from Spaceman USA to ensure proper maintenance. Extra
wearable parts (except scraper blades) are found in the Start-Up Kit.
7
Tune-Up Kit