![SP Scientific LYOSTAR II Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/sp-scientific/lyostar-ii/lyostar-ii_operators-manual_1338679049.webp)
FTS Systems LyoStar™ II
Optional Sample Extractor Assembly
Rev 012, 04/11
41
© SP Scientific 2011
Shut the isolation door then lower the handle to seal it closed.
7.
Inert gas back fill may be performed at this time if gas is supplied to the
8.
vacuum break valve.
Remove the shroud from the stoppering ram to manually stopper the vial(s).
9.
Open the inert gas fill/vacuum break valve until the antechamber is back to
10.
atmospheric pressure.
Loosen the thumb screws and slide the front plate down until it can be
11.
opened.
Remove the stoppered vials.
12.
Close the front plate to reseal the chamber for the next run.
13.
Open front plate
to remove the vials
Содержание LYOSTAR II
Страница 1: ...LYOPHILIZER OPERATOR S MANUAL FTS SYSTEMS LYOSTAR II STANDARD...
Страница 2: ......
Страница 6: ...iv Rev 012 04 11 SP Scientific 2011...
Страница 29: ...FTS Systems LyoStar II Operating Your Lyophilizer Rev 012 04 11 21 SP Scientific 2011...
Страница 38: ...Data Management FTS Systems LyoStar II 30 Rev 012 04 11 SP Scientific 2011...
Страница 52: ...Optional Isolation Valve FTS Systems LyoStar II 44 Rev 012 04 11 SP Scientific 2011...
Страница 58: ...Optional Cleanroom Configuration FTS Systems LyoStar II 50 Rev 012 04 11 SP Scientific 2011...
Страница 66: ...General Maintenance FTS Systems LyoStar II 58 Rev 012 04 11 SP Scientific 2011...
Страница 70: ...Appendix A Troubleshooting FTS Systems LyoStar II 62 Rev 012 04 11 SP Scientific 2011...
Страница 71: ......