4.1 Positioning the Machine
1. Unfasten the machine from the shipping skid.
2. Verify area is clear of tools, debris, and personnel.
3. Using an appropriately rated fork truck, insert the forks into the fork pockets located on the
sides of the machine. Forks can be inserted in either direction.
Approximate weight on machine: 4,800 lb.
4. Raise the machine only enough to clear the shipping skid and transport the machine to the
desired location.
5.
Carefully lower the machine onto the floor.
If anchoring the machine:
6. Mark the locations of the four anchor points, located at each end of the outriggers, and drill
holes according to the lag bolt manufacturer’s specifications.
7.
Insert and tighten the lag bolts according to the lag bolt manufacturer’s specification.
8. Install the guardrails using the supplied hardware (both sides of machine).
USE SUPPLIED HARDWARE IN THESE
LOCATIONS TO ATTACH GUARD RAILS
ANCHOR POINT (BOTH
ENDS OF OUTRIGGER,
BOTH SIDES OF MACHINE)