Carefully, break down the crate and store in a safe location in the case that it 
may need to be sent back to the factory for service. 

 

ELECTRICAL REQUIREMENTS 

The FPS-650 and FPS-1250 requires 110–125VAC / 50-60hz / 1ph / 20A or 
220-240VAC  /  50-60hz  /  1ph  /  20A  connection.  A  dedicated  circuit  is 
suggested for each install. The electrical panel as a 20A circuit breaker built 
into the on/off rocker switch. The system is UL 508A ICP approved. Electrical 
schematic available upon request. 

 

INSTALLATION (FOR FPS-650) 

The N

2

-

BLAST® 

FPS-650 can be mounted to a wall or placed on a floor.  It 

is  recommended  that  the  N

2

BLAST® 

FPS-650  be  mounted  to  a  weight-

bearing wall that can support its weight as specified in 3.2 Specifications. 

If  placed  on  t h e   floor,  it  should  still  be  fastened  in  place  so  that  it 

cannot  move  due  to vibration  or  damaged  from  falling  over.  The  N

2

-

BLAST® 

should  always  be  installed  indoors  in  an environment  between 

40° and 90° F in the upright position where it will not be damaged by water 

or moving equipment.  Leave at least 6” on the left side of the cabinet for 

ventilation,  but  36”  is  recommended  for  access  to  the  control  panel, 

tube/pipe connections, and the front cover. There is a ¼” OD tube drain port 

on the bottom right of the cabinet. This can be plumbed to the nearest site 

drain. 
There is an optional mounting bracket kit (STS Part #: A05-TYP1-RD), that 
allows  you  to  mount  the  system  on  a  standard  16”  wall  stud  width. 
Otherwise,  use  the  mounting  holes  on  the  cabinet  for  mounting  the  N

2

-

BLAST

® 

securely and level, directly to the wall. 

Figure 2: Shipping Lock Bolts 

Содержание N2Blast FPS-1250

Страница 1: ...FPS 650 FPS 1250 Fire Protection Systems O M Manual Version 7 09 06 2019 2020 The Leader in Nitrogen Generation Technology...

Страница 2: ...son 1 J Nguyen 10 13 15 A Norman 10 13 15 Initial Release 2 J Nguyen 7 5 15 A Norman 7 5 15 3 J Nguyen 8 15 16 A Norman 8 15 16 4 J Nguyen 4 27 16 A Norman 4 27 16 Updated Bypass Info 5 Matt Thomas 9...

Страница 3: ...ical Requirements 11 Installation For FPS 650 11 Installation For FPS 1250 13 Panel Layout and Gas Connections 14 Air Bypass Setup optional 17 Start up Procedures 17 Checking for Leaks 18 Access Contr...

Страница 4: ...ff and should be read in its entirety prior to operation Please contact your local distributor provider for any operation and maintenance first prior to contacting the manufacturer IMPORTANT INFORMATI...

Страница 5: ...when performing maintenance and repairs Make sure that replacement parts meet or exceed the original parts specification Only authorized trained and competent individuals can perform installation oper...

Страница 6: ...of the FPS 650 and FPS 1250 must follow safe working practices OSHA and local health safety code regulations during the installation operation and maintenance of the unit Warning This manual must be r...

Страница 7: ...t filter maintenance schedule if you are installing the generator in dirty environment Air Filters The generator has two filters after the air compressor the particulate and coalescing The Particulate...

Страница 8: ...tional The Blast Off Leak Detection will provide the end user with an alarm when it detects characteristics of a leak somewhere on the system It will trigger an audible alarm display it on the screen...

Страница 9: ...ter and will display the current run mode on the screen Run in Green and StdbY in Yellow The layout of the controller can be seen on the next page System Status Run mode is when the FPS 650 and FPS 12...

Страница 10: ...d and all parts should be inspected for damage upon receipt For the N2 BLAST FPS 1250 system a wooden crate is used for shipping and should be opened on the side noted on that crate Identify and verif...

Страница 11: ...ng wall that can support its weight as specified in 3 2 Specifications If placed on t h e floor it should still be fastened in place so that it cannot move due to vibration or damaged from falling ove...

Страница 12: ...n the back of the cabinet vs the wall a Use the supplied nuts and bolts to attach the upper 12 bracket onto the top flange per the diagram b Use the supplied carriage bolts and nuts to attach the 18 l...

Страница 13: ...clearance room on the top for N2 gas connection clearance room on the left side for access to the panel and clearance room on the front for maintenance access See Figure 6 for dimensions and overall c...

Страница 14: ...S See figures below for panel layout and gas connections Double check all connection locations before turning on the system or opening any valves Note All N2 BLAST models are factory equipped with NPT...

Страница 15: ...FPS 650 and FPS 1250 South Tek Systems Version 7 Revision Date 9 6 19 Page 15 of 29 Figure 5 100 N2 Storage Tank Setup...

Страница 16: ...FPS 650 and FPS 1250 South Tek Systems Version 7 Revision Date 9 6 19 Page 16 of 29 Figure 6 FPS 1250 Dimensions and Connections...

Страница 17: ...ly shortening its life and cause excess wear on the compressor The installation layout drawings are provided with your system in the documentation package of the system For electronic copies please co...

Страница 18: ...harging the storage tank automatically The pressure switch is preset at the factory no field adjustment is required CHECKING FOR LEAKS When a leak is suspected first try to listen for leaks and or spr...

Страница 19: ...e red manifold 5 Within 5 minutes the system should go into Standby Mode If it doesn t contact your local provider installer for further assistance 6 Once in Standby mode wait 60 seconds After 60 seco...

Страница 20: ...ons BlastOff Leak Detection System Alarm An optional feature that can be included with the system is the BlastOff Leak Detection System It is a patented system when installed into the FPS 650 and FPS...

Страница 21: ...r every 1000 hours whichever comes first To do so remove the pre compressor filter cap by twisting it clockwise Remove the old element and use a clean dry cloth to clean the filter bowl before install...

Страница 22: ...hever comes first To do so 1 Make sure there is no pressure on the filter bowls The gauge after the filter bowl will read 0 PSIG to indicate that there is no pressure on the bowl 2 Unscrew the filter...

Страница 23: ...nding filter housings Once all the filters have been replaced press and hold the filter reset button on the electrical panel an audible beep will confirm the reset To use the Filter Change Reset Butto...

Страница 24: ...e and store Nitrogen at 70 5 psig Once the storage tank reaches 70 5 psig the system will go into Stand By Mode When the pressure drops by about 7 10 psig the system should go into Operation Mode and...

Страница 25: ...t is equipped with The BlastOff Leak Detection feature If the buzzer is on there may be a leak in one of the sprinkler lines AMD or fittings may not be properly seated causing leaks Note Turn off this...

Страница 26: ...ifferent specification at the factory s option Any work performed by an unauthorized person company or usage of non factory parts may void all warranties to the product Any item not manufactured by So...

Страница 27: ...ce OCPD The compressor features an internal thermal overload which may be reset manually on the back of the compressor if tripped but an over current and short circuit protection disconnect rated for...

Страница 28: ...ust be in the fully upright position Once generator is in Bypass Mode and the system is ready for filling turn on the compressor using the external disconnect Once system is done filling switch the ge...

Страница 29: ...FPS 650 and FPS 1250 South Tek Systems Version 7 Revision Date 9 6 19 Page 29 of 29 Last Page...

Отзывы: