South-Tek Systems
Version:
0
Revision Date: 6/29/18
Page 9 of 18
3.3
TURNING ON THE GENERATOR FOR THE FIRST TIME
•
To start the generator once electrical and plumbing connections are
made, simply push the green power switch on the front of the
generator to the ON(up) position.
Note: On startup the generator will have a 12 second delay before the
compressor operates. This is designed to prevent damage to the
compressor.
•
At this point the power switch should be illuminated designating the
system is operating and the generator will start filling the internal
storage tank.
•
It is suggested that the system plumbing leading to the cold brew
system be purged with the nitrogen being generated in the initial
start-up for at least 15 minutes to ensure the best purity of nitrogen
for pouring.
•
Watch the system fill and fix any leaks determined down stream of
the nitrogen generator. Leaks can cause excessive run times and
wear on components.
•
Once the storage tank is full (~90 PSIG) the generator will shut off
and go into standby (amber light will be illuminated).
Содержание BREW BLAST 110CPH
Страница 1: ...The Leader in Nitrogen Generation Technology 110CPH Quick Start Guide Version 0 06 29 2018 2020 ...
Страница 3: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 3 of 18 Notes ...
Страница 17: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 17 of 18 Wilmington NC 28405 ...
Страница 18: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 18 of 18 Last Page ...