![South-Tek Systems BREW BLAST 110CPH Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/south-tek-systems/brew-blast-110cph/brew-blast-110cph_quick-start-manual_1336830007.webp)
South-Tek Systems
Version:
0
Revision Date: 6/29/18
Page 7 of 18
3
INITIAL START-UP
3.1
ELECTRICAL CONNECTIONS
Connect the power cord supplied with the
BrewBlast™ 110CPH
to the plug on the
back of the system label
ed “Power Supply” and plug the opposite end into a
standard 120VAC/60Hz/1ø wall receptacle (preferably a designated small
appliance circuit).
Customer Alarm
These connections are for remote monitoring of the equipment, they can be used
to connect to an audible or visual alarm indicator or run to a building
management device. These contacts are rated for a maximum of 1A at 5-
27VDC/5-240VAC. Follow local and site regulations when wiring these
connections.
The yellow wire acts as the common which will supply power to the NO or NC
depending on alarm status. If an alarm is triggered, including BlastOff
™, filter
replacement, and compressor replacement, the COM and NO will be connected,
and the COM and NC will be disconnected. The NC connection (red) also acts as
a power loss indicator, it will signal if the generator is unplugged or accidentally
turned off.
Содержание BREW BLAST 110CPH
Страница 1: ...The Leader in Nitrogen Generation Technology 110CPH Quick Start Guide Version 0 06 29 2018 2020 ...
Страница 3: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 3 of 18 Notes ...
Страница 17: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 17 of 18 Wilmington NC 28405 ...
Страница 18: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 18 of 18 Last Page ...