Transport, storage, installation
5
GasLab Q2
G a s Q u a l i t y A n a l y z e r
Page 27 of 135
5
Transport, storage, installation
This chapter sets out an overview of how the device is handled before, during and after mounting
at the installation location.
Observe the liability notes on page 3 of this manual for damage caused by
wrong transport, improper storage, installation and unauthorized
modifications or technical changes.
Steps for installation
1.
Unpack the Q2 and any other components and check them for damage and
missing or incorrect parts.
2.
Mount the device in place with suitable mounting material (not included).
See chapter 5.2 (mechanical Installation)
3.
Connect the gas supply lines with the Q2, connect the exhaust and vent
tubes, customize the gas pressures, open the shut-off valves and check all
lines for leaks.
See chapter 5.3 (fluidic installation)
4.
Install the power supply and connect the communication cable.
See
chapter 5.4 (electrical installation)
5.
If you want to use the extended device functionalities, install enSuite on your
parameterization device (computer / PC)
Installing the PC software enSuite (
See chapter 8.2.1)
The installation sequence is described in more detail in the following subsections.
5.1 Transport / storage
Store Q2 in a clean and dry place. Prevent dirt from entering the interior of
the device. Prevent material damage from forming condensation.
The following regulations apply for storage:
Environmental Specifications (see chapter 10.1) must be maintained.
Packaging must only be stored under indoor conditions.
Mechanical vibrations must be avoided during storage.
The storage time with battery up to one year, 2 years with subsequent battery replacement.
The Q2 must not be exposed to temperatures below -25°C or above +55°C.
If transported in cold weather, or if subject to extreme variations in temperature, the device must be slowly
brought to room temperature before it is commissioned to prevent damage from formation of condensation
Removal of transport protection or dirt protection is not allowed before the
device is installed at its final position, and as long as dirt is still able to
penetrate.