Installation & Operating Manual 12/2013
9.6
checking water heating
D
Styring put into operation
X
Set primary pump to highest power level.
X
Check water heating by means of temperature display on the styring. Use external temperature
measurement equipment if necessary.
9.7
concluding commissioning
D
System and piping checked for leaks
D
Styring put into operation
D
Water heating checked
X
Put cover (optional) into place and screw on laterally.
9.8
Handing over system to operator
X
Instruct operator of system in operating the system (according to operating manual for styring).
Point out safety rules and maintenance intervals.
X
Note set parameters in logbook at the handover.
X
Hand over all manuals to operator:
Installation and operating manual
Operating manuals of the components (styring, etc.…)
InFoRMAtIon
Operator:
X
Attach all manuals at the installation site of the stratified charging module or keep them in the
vicinity of the stratified charging manual.
10 operation
X
Observe third-party manual for the on-site installed thermal solar system.
X
Operate system in accordance with third-party manual for styring.
11
Error messages and malfunctions
Error messages appear in the styring display (see third-party manual).
X
In the event of error messages and malfunctions contact a specialist technician.
cAUtIon!
Risk of injury and property damage from leaks!
X
Have malfunctions resolved only by a specialist technician.