Laboratory services 

SONEL  Testing  and  Calibration  Laboratory  has  been  accredited  by  the 
Polish Center for Accreditation (PCA) 

– certificate no. AP 173.  

 
Laboratory  offers  calibration  for  the  following  instruments  that  are  used 
for measuring electrical and non-electrical parameters. 
  

● 

METERS FOR MEASUREMENTS OF ELECTRICAL PARAMETERS  

o

 

voltage meters, 

o

 

current meters (including clamp meters), 

o

 

resistance meters, 

o

 

insulation resistance meters, 

o

 

earth resistance and resistivity meters, 

o

 

RCD meters, 

o

 

short-circuit loop impedance meters, 

o

 

power quality analyzers, 

o

 

portable appliance testers (PAT), 

o

 

power meters, 

o

 

multimeters, 

o

 

multifunction meters covering the functions of the above-mentioned instruments, 
 

● 

ELECTRICAL STANDARDS 

o

 

calibrators, 

o

 

resistance standards, 
 

● 

METERS FOR MEASUREMENTS OF NON-ELECTRICAL PARAMETERS 

o

 

pyrometers, 

o

 

thermal imagers, 

o

 

luxmeters. 

 

The Calibration Certificate is a document that presents a relation between the  calibration standard of 
known  accuracy  and  meter  indications  with  associated  measurement  uncertainties.  The  calibration 
standards are normally traceable to the national standard held by the National Metrological Institute.  
 
According  to  ILAC-

G24  „Guidelines  for  determination  of  calibration  intervals  of  measuring  instru-

ments”,  SONEL  S.A.  recommends  periodical  metrological  inspection  of  the  instruments  it  manufac-
tures no less frequently than once every 12 months. 
 
For new instruments provided with the Calibration Certificate or Validation Certificate at the factory, re-
calibration should be performed within 12 months from the date of purchase, however, no later than 24 
months from the date of purchase. 
 

 

ATTENTION! 
 

The  person  performing  the  measurements  should  be  absolutely  sure  about  the  effi-
ciency  of  the  device  being  used.  Measurements  made  with  an  inefficient  meter  can 
contribute  to  an  incorrect  assessment  of  the  effectiveness  of  health  protection  and 
even human life. 

 
 
 

Содержание S-110 DC

Страница 1: ......

Страница 2: ......

Страница 3: ...USER MANUAL HIGH VOLTAGE INSULATION TESTERS S 50 DC S 80 DC S 110 DC S 120 DC SONEL S A Wokulskiego 11 58 100 widnica Version 1 02 11 09 2020...

Страница 4: ...S 120 DC USER MANUAL 2 S 50 80 110 120 DC is a modern easy in use and safe testing device Please acquaint yourself with this manual in order to avoid measuring errors and prevent possible problems in...

Страница 5: ...g the discharge rod 8 3 4 Attaching the corona ring 9 3 5 Connecting the test equipment 10 4 Operating the device 13 4 1 Controls and displays 13 4 2 Operating procedure 14 4 2 1 Setting the operating...

Страница 6: ...th Only operate the system if it is in technically perfect condition No non original parts may be used for the system and its peripherals as the necessary safety will not be guaranteed No mode of work...

Страница 7: ...e equation I U R where U measuring voltage I measured current A special protective ground circuit ensures a high level of safety 2 1 Design of the set The test set consists of the operating unit and t...

Страница 8: ...80 110 120 DC is used for electrical testing of power cables and plant with direct voltage Areas of application include testing at re commissioning of cable systems after maintenance and repair testin...

Страница 9: ...ting unit 3 2 Operating requirements The carrying handle of the operating unit is designed for one hand operating After putting down the device carrying handle can be locked in 30 steps by using a pul...

Страница 10: ...ve instructions it must be placed in close proximity to the test object so that the ground and high voltage cables can be kept as short as possible When the equipment is set up in the field it must be...

Страница 11: ...spacer is only plugged onto the HV unit without screwing Connect the HV lug only hand tight with the knurled screw Consider following differences to the standard design The smoothing of electricals fi...

Страница 12: ...tablish a conductive connection between the station auxiliary ground and the ground terminal of the high voltage unit Screw the high voltage attachment onto the high voltage unit and connect the high...

Страница 13: ...gle core system or a three core cable with separate shield on each core All three cores can be tested at the same time Fig 3 4 Connecting the test equipment for insulation testing of a three core cabl...

Страница 14: ...ANUAL 12 Fig 3 5 Connecting the test equipment for sheath testing of a 3x single core system The sheaths of all three cores can be tested at the same time The cable shields at the other end of the cab...

Страница 15: ...f it is in the leftmost position while enabling the button Unit on lamp white Lights up when the unit is switched on with the mains switch and mains voltage is connected Ground terminal lamp yellow Li...

Страница 16: ...ble 1 ground cable for operating unit to station ground Pilot lamp signals proper connection of the station and protective grounds independently of the high voltage being connected The equipment will...

Страница 17: ...s exceeded by approx 5 kV the overvoltage trip will re spond If this happens the high voltage will have to be switched back on set the high voltage adjuster to zero first Fig 4 2 Left meter display Ri...

Страница 18: ...t must only be operat ed in areas which have been secured and or cordoned off and marked in accordance with EN 50191 and EN 50110 1 standards In an emergency the high voltage must be switched off by a...

Страница 19: ...re external soiling direct sunlight and ambient temperatures in excess of 55 C must be avoided NOTE The high voltage unit must only be transported in an upright position 6 Technical specifications a p...

Страница 20: ...18 5 kg S 110 DC 20 0 kg S 120 DC 20 5 kg o degree of protection as per EN 60529 operating unit IP40 high voltage unit IP65 high voltage unit at terminals IP00 p max voltage discharge energy for disc...

Страница 21: ...e 3 blue lead for high voltage unit length 2 m cable 4 ground cable for discharge rod discharge rod case for discharge rod user manual service kit packing 7 2 Optional accessories Additionally the fol...

Страница 22: ...ermal imagers o luxmeters The Calibration Certificate is a document that presents a relation between the calibration standard of known accuracy and meter indications with associated measurement uncert...

Страница 23: ......

Страница 24: ......

Отзывы: