background image

S-50 DC 

● S-80 DC ● S-110 DC ● S-120 DC – USER MANUAL 

10 

3.5 

Connecting the test equipment 

 

NOTE! 
 

Before connecting the equipment, make sure that the oil level is visible in the centre of 
the oil-level lens 

. If not, measurements are forbidden. 

 
Before  the  test  equipment  is  connected,  safe  isolation  from  supply  must  be  established  and  safe-
guarded in accordance with EN 50110-1. The requirements of EN 50191 and EN 50110-1 standards 
must be complied with. The test equipment should be connected in the following order: 
 

 

Ground and short-circuit the conductor of the test object that is not going to be tested  (connect 
to station ground or auxiliary ground point). In the case of ungrounded test objects, the test set 
can only be used if an auxiliary ground is provided. 

 

 

 

Establish a conductive connection between the station/auxiliary ground and the ground terminal  

of the high-voltage unit 

 

 

 

Screw the high-voltage attachment 

 onto the high-voltage unit and connect the high-voltage 

terminal 

 to the test object. 

 

 

 

Connect the ground terminal of the operating unit 

 to the station/auxiliary ground. 

 

 

 

Connect  the  ground  and  discharge  rod  to  the  ground  terminal  of  the  test  object  and  hold  the 
discharge rod at the ready. 

 

 

 

Connect the five-pole connecting cable, which is permanently attached to the operating unit, to 
the high-voltage unit (terminal 

). 

 

 

 

Connect the operating unit to the mains. 

 

 

NOTE! 

 

The blue connecting cable between high-voltage terminal and test object is to use as 
uninsulated overhead cable. 

 

 

If the device is powered by Mains Voltage from a grounded Mains socket (the yellow 
control  light  lights  on),  there  is  no  need  of  additional  grounding  by  the  green/yellow 
protection ground cable. That’s important to avoid ground loops. 

 

 

Содержание S-110 DC

Страница 1: ......

Страница 2: ......

Страница 3: ...USER MANUAL HIGH VOLTAGE INSULATION TESTERS S 50 DC S 80 DC S 110 DC S 120 DC SONEL S A Wokulskiego 11 58 100 widnica Version 1 02 11 09 2020...

Страница 4: ...S 120 DC USER MANUAL 2 S 50 80 110 120 DC is a modern easy in use and safe testing device Please acquaint yourself with this manual in order to avoid measuring errors and prevent possible problems in...

Страница 5: ...g the discharge rod 8 3 4 Attaching the corona ring 9 3 5 Connecting the test equipment 10 4 Operating the device 13 4 1 Controls and displays 13 4 2 Operating procedure 14 4 2 1 Setting the operating...

Страница 6: ...th Only operate the system if it is in technically perfect condition No non original parts may be used for the system and its peripherals as the necessary safety will not be guaranteed No mode of work...

Страница 7: ...e equation I U R where U measuring voltage I measured current A special protective ground circuit ensures a high level of safety 2 1 Design of the set The test set consists of the operating unit and t...

Страница 8: ...80 110 120 DC is used for electrical testing of power cables and plant with direct voltage Areas of application include testing at re commissioning of cable systems after maintenance and repair testin...

Страница 9: ...ting unit 3 2 Operating requirements The carrying handle of the operating unit is designed for one hand operating After putting down the device carrying handle can be locked in 30 steps by using a pul...

Страница 10: ...ve instructions it must be placed in close proximity to the test object so that the ground and high voltage cables can be kept as short as possible When the equipment is set up in the field it must be...

Страница 11: ...spacer is only plugged onto the HV unit without screwing Connect the HV lug only hand tight with the knurled screw Consider following differences to the standard design The smoothing of electricals fi...

Страница 12: ...tablish a conductive connection between the station auxiliary ground and the ground terminal of the high voltage unit Screw the high voltage attachment onto the high voltage unit and connect the high...

Страница 13: ...gle core system or a three core cable with separate shield on each core All three cores can be tested at the same time Fig 3 4 Connecting the test equipment for insulation testing of a three core cabl...

Страница 14: ...ANUAL 12 Fig 3 5 Connecting the test equipment for sheath testing of a 3x single core system The sheaths of all three cores can be tested at the same time The cable shields at the other end of the cab...

Страница 15: ...f it is in the leftmost position while enabling the button Unit on lamp white Lights up when the unit is switched on with the mains switch and mains voltage is connected Ground terminal lamp yellow Li...

Страница 16: ...ble 1 ground cable for operating unit to station ground Pilot lamp signals proper connection of the station and protective grounds independently of the high voltage being connected The equipment will...

Страница 17: ...s exceeded by approx 5 kV the overvoltage trip will re spond If this happens the high voltage will have to be switched back on set the high voltage adjuster to zero first Fig 4 2 Left meter display Ri...

Страница 18: ...t must only be operat ed in areas which have been secured and or cordoned off and marked in accordance with EN 50191 and EN 50110 1 standards In an emergency the high voltage must be switched off by a...

Страница 19: ...re external soiling direct sunlight and ambient temperatures in excess of 55 C must be avoided NOTE The high voltage unit must only be transported in an upright position 6 Technical specifications a p...

Страница 20: ...18 5 kg S 110 DC 20 0 kg S 120 DC 20 5 kg o degree of protection as per EN 60529 operating unit IP40 high voltage unit IP65 high voltage unit at terminals IP00 p max voltage discharge energy for disc...

Страница 21: ...e 3 blue lead for high voltage unit length 2 m cable 4 ground cable for discharge rod discharge rod case for discharge rod user manual service kit packing 7 2 Optional accessories Additionally the fol...

Страница 22: ...ermal imagers o luxmeters The Calibration Certificate is a document that presents a relation between the calibration standard of known accuracy and meter indications with associated measurement uncert...

Страница 23: ......

Страница 24: ......

Отзывы: