Installation
18
EN
- EXAVIA installation and operating guide - SOMFY
EN
1
Securing the control unit
1
•
Position the unit mounting bracket (p) against the pillar/wall.
•
Check that it is horizontal.
•
Mark the mounting points for the bracket.
2
Remove the bracket and drill the pillar/wall. The drilling
diameter is to be defined based on the type of screws used
for mounting (see page 11).
3
Secure the bracket to the pillar/wall.
4
Position the base of the unit to mark the 2 mounting points at
the bottom of the unit.
5
Remove the base of the unit then drill the pillar/wall. The
drilling diameter is to be defined based on the type of screws
used for mounting (see page 11).
6
Secure the base of the unit to the pillar/wall: 1 screw (q) to
secure the unit to the b 2 screws to secure the unit to
the pillar/wall.