93
g) Tighten the top plate using two screws
A
(DIN 912 M5x12) and two nuts
B
(DIN
6923 M5) in the rear holes marked in the previous figure.
Figure 56 - Fixing the top of the equipment frame
h) Fasten the display to the top by screwing two screws G (DIN 7981 5,5x13), as
shown in Figure 57.
Very important:
It may be necessary to center the display relative to the center axis
of the top so you should loosen the screws and move the display horizontally until it is
centered, tighten the screws again.
Figure 57 - Placing the top on the equipment frame
A
A
B
G
G
6º (Alpes K400 and Alpes K300)
7º (Alpes K400 and Alpes K300)
Содержание K100
Страница 149: ...144 ...
Страница 150: ...145 ...
Страница 151: ...146 ...
Страница 165: ...160 26 Flow chart 26 1 Flow chart K100 K200 K500 and K600 Lighting ...
Страница 166: ...161 ...
Страница 167: ...162 Disabling ...
Страница 168: ...163 26 2 Flow chart K300 and K400 ...
Страница 169: ...164 ...
Страница 170: ...165 Disabling ...