background image

4

lci1.com      

 

574-537-8900    

 

Rev:07.19.18

Solera

®

 

Power Awning 18V

Installation and Owner’s Manual

(For Aftermarket Applications)

CCD-0001260

Awning Rail Installation

If installation of an awning rail is required, complete the 

following steps.

1. 

Position the awning rail along the line where roof and 

wall meet OR:

A. 

For pitched awnings: A minimum of 6" above doors or 

windows.

B. 

For flat awnings: A minimum of 2 

1/2

" above doors or 

windows.

NOTE: 

The awning rail must be level and parallel with the 

floor line of the unit 

(Fig.1)

.

Letter  Description

A

Awning Rail

B

Support Arm Assembly

C

Roll Tube Assembly

Fig.1 

front facing view

floor line

 A

 B

 B

 C

2. 

After determining the awning rail’s proper location, mark 

its position with a non-permanent method of marking.

3. 

Seal the back of the awning rail.

4. 

Align the awning rail on the wall and secure with #10 x 

3/4

" screws, using all fastener holes.

Содержание 434729

Страница 1: ...lation 4 Awning Installation 5 Securing The Fabric 7 Operation 8 Extending the Awning 8 Retracting the Awning 9 Adjusting Pitch 9 Troubleshooting 10 Manual Override 10 Solera Power Awning 18V Installation and Owner s Manual For Aftermarket Applications Solera Power Awning Troubleshooting 11 Maintenance Solera Awnings 12 Fabric Care 12 Notes 12 Solera Power Awning 18V Kits Part Description 434729 S...

Страница 2: ...llation no internal wiring needed to the RV s main power source Parts List PN Description Common Qty 237315 Rivet AL AL Klamp Tite 3 16 X 1 3 8 281079 Screw Zn Hex Washer SLFDR Blk 6 20 X 1 2 2 298760 Pin 0 093 X 2 5 16 Zn Hairpin Cotter 4 347119 Pin 1 8 X 3 Zn Cotter 2 384905 Screw SST PNH Plain PH 10 32 X 2 1 2 2 384906 Nut Nylock Plain 10 32 2 438247 Cable Tie Standard NYL 30 White 2 CCD 000 12...

Страница 3: ... WITH OTHER HOUSEHOLD RECYCLABLE MATERIALS THE BATTERY MUST BE DISPOSED OF PROPERLY AT A HOUSEHOLD HAZARDOUS WASTE COLLECTION SITE Prior to Installation If the unit does not have a pre installed awning rail one must be purchased All screws supporting the awning assembly must have a backer within the structure of the wall of the unit Refer to the unit manufacturer for proper location This manual wi...

Страница 4: ...m of 6 above doors or windows B For flat awnings A minimum of 2 1 2 above doors or windows NOTE The awning rail must be level and parallel with the floor line of the unit Fig 1 Letter Description A Awning Rail B Support Arm Assembly C Roll Tube Assembly Fig 1 front facing view floor line A B B C 2 After determining the awning rail s proper location mark its position with a non permanent method of ...

Страница 5: ...g a non permanent method of marking mark a perpendicular line from the awning rail down to the floor line This is the centerline of the support arm assembly Fig 2 3 Insert the drive head assembly shaft into the end cap Fig 3 Align the holes and secure with a waxed screw Repeat process for idler head assembly at opposite end NOTE Keep the head of the wax screw 1 8 from fastened to avoid compromisin...

Страница 6: ... walk the support arm assemblies and fabric down the awning rail channel until the support arm assemblies are in line with the previously made centerline marks 9 Lift the support arm assembly up and secure by setting the awning assembly to the desired height and attaching it to the side of the unit with two 14 x 1 1 4 screws at the top Fig 5 and two 14 x 1 1 4 screws at the bottom Fig 6 NOTE Best ...

Страница 7: ...y of the three locations shown in the center of the support arm Fig 7 13 Repeat this process for the other side of the awning assembly Fig 7 possible fastener locations Securing The Fabric 1 Extend and retract the awning several times to make sure the fabric is square on the roll tube 2 On both ends secure the fabric in the awning rail no more than 1 inside the edge of the fabric using a 6 x 1 2 h...

Страница 8: ...to battery pack to drive head to charger Charging the Battery The battery for the Solera 18V Power Pack is located inside the drive arm The awning will operate 22 25 times before needing to be recharged 1 Locate the battery wires Fig 9A stored inside the bottom of the drive arm The wires will be affixed with a hook and loop fastener 2 Attach the battery wires to the included battery charger cord F...

Страница 9: ... 13 to allow for water runoff NOTE Do not push the joint of the pitch arm up past the point where the two sections are in line This will put tension on the gas strut which can cause the strut to break pitch Extension is considered complete when the fabric is completely unrolled the valance is hanging down from the roll tube and a section of the roll tube is exposed Fig 12 The awning fabric should ...

Страница 10: ...1 Remove the rubber grommet Fig 15A from the drive head assembly exposing the manual override nut on the motor A A NOTE The drive head assembly is always located on the right side of the awning as it is viewed from outside of the unit 2 Using a 7 16 socket and cordless or electric drill or screw gun spin the manual override nut counterclockwise to retract the awning Fig 16 Fig 14 Fig 15 Fig 16 NOT...

Страница 11: ... during retract than extend Retract is approximately 30 seconds while extend is approximately 20 seconds on a fully charged battery Make sure pitch arms are not bent in an upward direction Lights won t work There is a resettable fuse that can take up to 30 seconds to reset Make sure to have 12V DC to the red wire on the light Awning seems to wobble when extending or retracting Make sure the bolts ...

Страница 12: ...ap and five gallons of warm water 1 Liberally apply the mixture on the top of the fabric and retract the awning for five minutes This will apply the mixture to the bottom of the fabric as well 2 Extend the awning and hose off with fresh water 3 Repeat if necessary 4 Allow to dry before retracting Notes Manual information may be distributed as a complete document only unless Lippert Components prov...

Отзывы: