8
lci1.com
574-537-8900
Rev:07.19.18
Solera
®
Power Awning 18V
Installation and Owner’s Manual
(For Aftermarket Applications)
CCD-0001260
Operation
Extending the Awning
1.
Locate the locking latch on the side of the support arm, if
equipped, and unlock the latch.
NOTE:
This latch is optional and may or may not be
installed on one or both support arms.
2.
Lift up and hold the switch
(Fig.11A)
until the awning is
extended completely.
to battery
pack
to drive head
to charger
Charging the Battery
The battery for the Solera 18V Power Pack is located
inside the drive arm. The awning will operate 22-25 times
before needing to be recharged.
1.
Locate the battery wires
(Fig.9A)
stored inside the
bottom of the drive arm. The wires will be affixed with a
hook-and-loop fastener.
2.
Attach the battery wires to the included battery charger
cord
(Fig.9B)
.
3.
Plug the charger
(Fig.10)
into a 110V outlet.
4.
When the battery is fully charged, a green light will
illuminate on the charger. A red light indicates the battery is
still charging.
A
B
A
extend
retract
Fig.9
Fig.10
Fig.11