![Sole Diesel 29 GSC Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/sole-diesel/29-gsc/29-gsc_operators-manual_1314509026.webp)
Systems and scheduled
maintenance
Solé, S.A. C-243 b, km 2 · 08760 Martorell (Barcelona) ·Tel. +34 93 775 14 00 · www.solediesel.com · [email protected]
25
Marine Diesel gensets. Operator’s Manual.
5.3.
General
Solé Diesel offers, for these genset models, a maintenance kit:
Maintenance task. Screw tightening, fastening
For details of tightening torques see Section 9 Torques.
Maintenance task. Valve clearance inspection
The rocker cover must be dismounted to check the valve clearance. This operation must be
carried out when the genset is cold.
Item
Assembly standard
Valve clearance (cold setting)
Inlet
0,25 mm
Exhaust
Inspection
1.
Insert the appropriate thickness gauge between the
rocker arm and valve cap to check the clearance.
2.
Loosen the rocker nut (1).
3.
Tighten or loosen adjusting screw (2) to adjust valve
clearance by checking thickness with thickness gauge (3).
4.
When you have adjusted the thickness, tighten the
rocker nut and recheck the thickness.
With piston nº1 in the top dead centre of the compression cycle,
adjust the play of the intake and exhaust valves of cylinder nº 1.
Proceed similarly as with the other cylinders. The position of the BTDC can be confirmed with the
aligning signs of the distribution or timing cover and the crankshaft pulley.
The adjustment of the valve play must be made after the cylinder head screws are again tightened.
(Strictly comply with the operation sequence indicated in the heading 4.1)
On board spare parts
Reference
29 GSC / 32 GSAC / 35 GTC / 40 GTAC DNV
17440110
45 GTC / 54 GTAC DNV
-
50 GTC / 60 GTAC DNV
17540110
68 GTC /84 GTAC DNV
17540110