Konfi guration EnergyManager
Geräteinstallation
Vorbereitung und Planung
EN
Then remove the blind plugs on the battery modules and
insert the battery cables coming from the MR Control into
the battery modules. Insert the shorter end of the battery
cable into the upper battery module and the longer end
into the lower battery module. Inspect the battery plug
for integrity and soiling.
5.7.3.
SOLARWATT MyReserve Extension
Install the battery modules of the Extension the same way
as in the procedure described in chapter 5.7.1 and 5.7.2.
IMPORTANT: Please see fi gure for the slots to be used!.
Lift the fi rst battery to the lower recess and the second
battery to the upper recess.
Then remove the blind plugs on the battery modules and
insert the battery cable coming from the MyReserve base
unit into the battery modules. For MyReserve Extension
(4,4 kWh) insert the longer end of the battery cable into
the upper battery module and the shorter end into the lo-
wer battery module. Inspect the battery plug for integrity
and damage.
Battery cable A
Battery cable B