Subject to changes | © 2017 SOLARWATT GmbH | AZ-TM-PME-0767 | Rev 008 | Version: 01/2017
Page 25
Konfi guration EnergyManager
Geräteinstallation
Vorbereitung und Planung
EN
5.6
Installation of the AC Sensor
The AC-sensor detects smallest current movements from
the house into the utility grid or vice versa and regulates
the MyReserve accordingly. Viewed from the grid, the AC
Sensor is installed downstream from the house fuse and
the utility Energy meter.
NOTE
The SOLARWATT AC Sensor is available in model
versions 50 and 63.
NOTE
NOTE
NOTE
5.6.1.
Installation of the AC Sensor 50
Install the AC Sensor in the building's distribution cabi-
net. Connect the AC Sensor in a de-energized state. The
AC connection is equipped with conventional screw ter-
minals. use appropriate bootlace ferules for neat termina-
tion of conductors in terminals. The connection terminals
for the CAN communication are designed as spring termi-
nals.
All external conductors (L1, L2, L3) from the utility energy
meter to the building distribution must be disconnected
in order for the AC Sensor to be installed. The neutral con-
ductor (N) is only executed as a single feeder for the pow-
er supply of the AC Sensor. It is not necessary to connect
the AC Sensor to the protective earth conductor (PE). Re-
fer to the connection diagram for the AC Sensor.
IMPORTANT
Observe the 5 safety rules!