Subject to changes | © 2017 SOLARWATT GmbH | AZ-TM-PME-0767 | Rev 008 | Version: 01/2017
Page 30
Konfi guration EnergyManager
Geräteinstallation
Vorbereitung und Planung
EN
The following fi gure is an example connection. For more exact specifi cations for the connection, contact the respon-
sible power supply company.
Single-phase connection
Three-phase connection
NOTE
The safeguarding of the conductors for voltage measurement can also be executed with a connection on an
existing circuit breaker in compliance with applicable standards and the manufacturer's specifi cations.
NOTE
NOTE
NOTE
Use a network cable for the CAN communication between the AC sensor and MyReserve
(minimum Cat.5e). Use the same twisted wire pair for High (H) and Low (L). In the process, connect (L) and (H)
to the same wire pair.
NOTE
NOTE