![SOLARFOCUS maximus L 150 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/solarfocus/maximus-l-150/maximus-l-150_installation-manual_1313806037.webp)
7 Electrical connection
7.4.6 Installing the emergency OFF switch
Austria: Firing systems for which a boiler room is
required must be equipped with an emergency OFF
switch, which must not have an effect on the room
lighting. It must be situated immediately outside the
access door and labelled clearly and visibly. This
switch may also be located inside the boiler rooms,
immediately next to the access doors, but only if the
boiler rooms can be accessed from outdoors.
►
Integrate the emergency OFF switch into the
safety chain of the boiler, connection
X6.1-X6.8
►
Connect other components integrated in the
safety chain in series ("loop through")
7.4.7 Pellet delivery system (A1:X14)
Suction system auger extraction
►
Connect the auger motor to the power element
X14, use cable 5x1.5 mm
2
.
5-pin connector, direct
extraction motor
Connection
X14
on the power element
PE
PE (1)
N
N (2)
L3
L (3)
L2
TC(4)
L1
TC (5)
Third-party manufacturer system
Use e.g. for pellet box transfer unit auger and for the
pellet mole
(these systems have integrated motor–
thermal protection).
►
Bridge the two thermal contact terminals (TC) on
the power element.
►
Use 3x1.5 mm
2
cable
7.4.8 External boiler request (A1:X28)
Potential-free Relay output for switching an external
boiler, e.g. an external boiler receives a release from
the SOLARFOCUS boiler control.
!
ATTENTION
– The connection is potential-
free and has a maximum load of 5A.
7.4.9 Malfunction (A1:X29)
Potential-free relay output, for example, to switch a
warning device (optical/acoustic). Triggered in the
event of an operating fault on the boiler.
!
ATTENTION
– The connection is potential-
free and has a maximum load of 5A.
7.4.10 External request (A1:X51)
Input, i.e. the SOLARFOCUS boiler can be started by
an external controller.
!
CAUTION
- The connection must be potential-
free.
Installation manual
maximus L
37
Содержание maximus L 150
Страница 16: ...Front Abb 2 10 Side view Abb 2 11 3 Technical requirements 16 Installation manual maximus L ...
Страница 44: ...11 Annex 11 1 Mounting boiler covers overview Abb 2 72 Abb 2 73 11 Annex 44 Installation manual maximus L ...
Страница 50: ...11 Annex 50 Installation manual maximus L ...
Страница 51: ...11 Annex Installation manual maximus L 51 ...