5 Installation
Latch in ash container
►
Press lever
1
down to the stop. The ash con-
tainer is thereby pressed against the auger chan-
nel.
Abb. 2-44: Latch in ash container
Adjust safety switch of ash container
The switch must be adjusted to the height (distance)
of the ash container.
►
Loosen 4× screws
1
and adjust height of switch
retaining plate
2
.
Abb. 2-45: Adjust safety switch
5.14 Mounting cladding on the boiler
►
Mount two covers on the back.
Illustration of further boiler covers
Installation manual
maximus L
31
Содержание maximus L 150
Страница 16: ...Front Abb 2 10 Side view Abb 2 11 3 Technical requirements 16 Installation manual maximus L ...
Страница 44: ...11 Annex 11 1 Mounting boiler covers overview Abb 2 72 Abb 2 73 11 Annex 44 Installation manual maximus L ...
Страница 50: ...11 Annex 50 Installation manual maximus L ...
Страница 51: ...11 Annex Installation manual maximus L 51 ...