10 Initial start-up
Connect electrical components
►
Connect components, the cables are in pre-routed
in ducts 3 and 2
.
Fig. 2-56: Intermediate pellet store
1 Pellet suction turbine
X4.13-X4.15
2 Filling level sensor
A1:X49
3 Container auger motor
(
Direct extraction motor 1
)
A3:X2
4 Container flap sensor
A2:X12
Connect the motor of the container auger
►
Connect the pre-routed cable as shown in the ter-
minal area of the motor.
Fig. 2-57: Connect the cable in the motor terminal area
10 Initial start-up
i
Initial commissioning of the boiler may only be
performed by certified personnel
(SOLARFOCUS service technician or
SOLARFOCUS specialist service partner) (=
condition for guarantee, warranty).
þ
The boiler is hydraulically connected.
þ
The heating system is filled with water and
has been vented.
þ
The boiler is electrically connected.
►
Connect the boiler to the mains power supply.
►
Carry out the commissioning routine in the boiler
control.
i
After having completed initial commissioning,
the completed commissioning form should be
returned to SOLARFOCUS. If this does not
happen, then for guarantee and warranty
claims of any kind the date of shipment from
the manufacturer to the dealer (according to the
delivery note and invoice) will be used.