Installing the Power Optimizers
SolarEdge Installation Guide for Three Phase Inverters
– EU – Version 1.5
19
PB250-AOB and PB350-AOB
These power optimizers connect to a single PV module via its two inputs (a
plus and a minus).
Figure 4: PB250-AOB and PB350-AOB
The following shows the required clearance around the power optimizer.
Figure 5: Clearance
1” (2.5 cm)
1” (2.5 cm)
1” (2.5 cm)
Input
+
Input
-
Output
-
Output
+