55. Transfer the UPS to inverter (i.e. Normal Mode)
56. Verify that output voltage under load is 230V ±2 %.
57. Record load current: L1 = A L2 = A L3 = A
58. Connect the Ethernet cable. Configures IP address, time server, and DHCP, according to the
preferences of the local IT team. (“Main > Setup > Communications”)
59. Export the log and then clear the log.