UPS for 208 Vac Grid, B120US Installation Guide, doc. rel. 3.0
3
Figure 3: Remove the roof and support beams (use electric screwdriver)
7.
Remove the screws that are holding the walls and support beams of the crate in place.
Then carefully remove the walls themselves leaving the UPS standing on its wooden
shipping pallet.
Figure 4: Remove the walls of the crate
8.
Cut and remove any straps that are securing UPS to the shipping pallet.
9.
Remove the plastic wrapping and all other packaging material from the UPS.