Cover installation BioX – wood log boiler 15 – 45
© Solarbayer GmbH [210205]
11
ATTENTION!
When the boiler is lifted in the air, it´s crushing hazard! DON´T stand under lifted weights!
1.
2.
3.
Check the shipment of the wood
boiler:
-
Boiler body
-
Side covers incl. screws in
the package on the side of
the boiler body
-
Exhaust blower, boiler feet
and the controller in the fire
room of the boiler body
Remove the top front cover (it´s
fixed with two cable straps on the
backside and one screw on the
front side).
The boiler is getting out of the palette
with a jack ring at the top of the boiler
body. The boiler have to place on the
intended boiler feet’s. To do that, you
have to screw the bolts form the top
in the track (look at the short manual
of the boiler feet’s).
The rubber buffers have to put under
the boiler with the metal side on top.
Put the boiler in the right position with
a level (the wood log boiler can drop
down to the front side, just in case if
incurred condensate).
Содержание BioX 15
Страница 1: ...Operating Instructions Wood log boiler Wood log boiler BioX 15 45...
Страница 76: ...Note 76 Solarbayer GmbH 210205 17 NOTE...
Страница 77: ...Note Solarbayer GmbH 210105 77...