June 2020
|
Solar Stik
®
, Inc.
42
|
24VDC PRO-Verter 5000-120 AGS Operator Manual
Set Start Gen
Volts = 18.0-31.8
Set Start Volts
Delay=0 sec-127 min
Set Stop Gen
Volts = 28.8
Set Stop Volts
Delay = 1 Min
continued
SETUP
04A Gen Run VDC
Press Select
Status
04 AGS Setup
Set Start Gen
Volts = 25.0
Set Start Volts
Delay = 15 sec
Set Stop Gen
Volts = 18.0-32.0, Float
Set Stop Volts
Delay=0 sec-127 min
Set Gen Run Time
Volts = OFF
Set Start Gen
Hour=1:00A
Set Start Gen
Minute= 00:45A
Set Start Gen
AM-PM= 00:00A
04B Gen Run Time
Press Select
Set Gen Run Time
Volts = ON
Set Start Gen
Hour = 12:00P
Set Start Gen
Minute= 00:00A
Set Start Gen
AM-PM= 00:00A
Default=OFF
Set Stop Gen
Hour= 1:00P
Set Stop Gen
Minute= 00:45P
Set Stop Gen
AM-PM= 00:00P
Set Stop Gen
Hour= 12:00P
Set Stop Gen
Minute= 00:00P
Set Stop Gen
AM-PM= 00:00P
Set Start Gen AC
Amps = OFF
Set Start Amps
Delay=0 sec-127 min
04C Gen Run Amps
Press Select
Set Stop Gen AC
Amps = 18.0-32.0
Set Stop Amps
Delay=0 sec-127 min
Default=OFF
Set Stop Gen AC
SOC = 21-100%
04D Gen Run SOC
Press Select
Set Start Gen AC
SOC = 20-99%
Default=OFF
AGS Function Notes
• After 15 seconds at or below 25.0 V, the PRO-Verter sends the
start signal to the Generator.
• After 1 minute at or above Float, the PRO-Verter turns off the
Generator.
• If the Generator does not start and the battery voltage gets
down to 24.4 V (LBCO), the AC Out (Inverter) turns off. This is the
LBCO voltage in the menu tree.
SETUP Button Menus continued
Setup: 04 AGS Setup
Continued on next page