Installation and Configuration
14
5.2
External Battery Cabinet Installation
Optional Sola/Hevi-Duty external battery cabinets may be connected to the UPS to provide additional
battery run time. External battery cabinets are designed to be placed on one side of the UPS or
stacked beneath the UPS.
1. Visually inspect the external battery cabinet for freight damage. Report damage to the carrier
and your local dealer or Sola/Hevi-Duty representative.
2. For slide rail installations, first remove the top/side fin. Top/side fin slides forward and then lift
up to remove. Optional rack-mount handles are shipped with the external battery cabinet and
may be installed at this time if desired.
3. Securing hardware and slide rails are sold separately. Please contact your local dealer or Sola/
Hevi-Duty representative for these additional options and any assistance needed. Fasten the
slides into position with the screws per the instructions included with the slide rails.
4. Use the enclosed support bases for the tower option to prevent tip-over. One additional set of
support base extensions ships with each external battery cabinet.
5. Connect the supplied external battery cabinet cable to the rear of the external battery cabinet,
then to the rear of the UPS.
6. The UPS is now equipped with additional backup battery run time. For approximate battery run
times, refer to
Table 6
.
!
CAUTION
The external battery cabinet(s) are heavy (see
13.0 - Specifications (Sechnische Daten)
).
External battery cabinets can be used in rack-mount or tower configuration. Take proper
precautions when lifting them.
!
VORSICHT
Externe Batteriegehäuse sind schwer (siehe
13.0 - Specifications (Sechnische Daten)
).
Externe Batteriegehäuse können in einer Rack-Montage- oder Turmkonfiguration eingesetzt
werden. Ergreifen Sie die entsprechenden Vorsichtsmaßnahmen, wenn sie gehoben werden
müssen.
NOTE
You must use the included configuration program to program the UPS for the number
of external battery cabinets connected. Instructions for the configuration program are in
7.0 - Configuration Program
.
3U
2U
2U
Spacers added to support
base to accommodate
additional battery cabinets