20
| 5.0 installation
7.
insert the equipment, with inner members attached, into the bracket assemblies by inserting the top and bottom
edges of the inner members into the top and bottom curved tracks of the front members. Slide the equipment into
the rack (see Figure 14). The ends of the inner members are tapered to allow the rear of the equipment to be angled
upward before insertion, if space allows. The equipment should move smoothly into the bracket assemblies. if it does
not, recheck the alignment of the front and rear members from Steps 2 and 3.
Insert the UPS into the front members.
Lift the front and push it into the rack.
Figure 14: Insert the UPS
8.
Secure the front of the equipment to the rack mounting rails to prevent the equipment from sliding out of position.
if securing holes are provided on the front of the equipment that align with the center holes on the return flange of
the front members, you can use the four extra M5 screws provided in the kit to secure the equipment. Otherwise, the
equipment should be secured to the front of the rack with four customer-supplied fasteners.