HYD 3K~6K-EP
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
。
- 46 -
1
.
Parallel Control: Enable or disable parallel functions. Both the master and
the slave must enable this function.
2
.
Parallel Primary-Replica: Set up the Primary and Replica.Select one
inverter as the Primary and set the others to Replica.
3
.
Parallel Address: Set the parallel address.Each inverter needs to set a
parallel address, and the parallel address in a parallel system cannot be repeated.
(
NOTE:The parallel address is different from the communication address used for
monitoring.
)
4
.
Save: Save after the setup is complete.
7. Bluetooth Reset
7.Bluetooth Reset
OK
Please confirm! OK Success
8. CT Calibration
To calibrate the direction and phase of the CT, the battery should be charged
or discharged when using this function.
8.CT Calibration
OK
Calibrating Sucess/Fault
Check if the battery is charging or discharging when calibration fails
。
6.3.3 Energy Statistic
3.Energy Statistic
OK
Today
PV ............................***KWH
Load .........................***KWH
Export ......................***KWH
Import.......................***KWH
Charge.......................***KWH
Discharge..................***KWH
Down↓
Month
PV ............................***KWH
Load .........................***KWH
Export ......................***KWH
Import.......................***KWH
Charge.......................***KWH
Discharge..................***KWH
Down↓
Year
PV ............................***KWH
Load .........................***KWH
Export ......................***KWH
Содержание HYD 3000-EP
Страница 1: ...Shenzhen SOFARSOLAR Co Ltd Energy storage integrated inverter Product Model HYD 3K 6K EP User manual ...
Страница 13: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 8 ...
Страница 21: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 16 ...
Страница 36: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 31 Fig 4 15 Electrical connections Plan A CT ...