4.5. Load connection
Procedure
:
Step 1
Select appropriate cables according to Table4-3, Remove the insulation
layer of the load output cable using a wire stripper according to the figure shown
below: A:15~25mm B:6~8mm .
Step 2
Disassemble the load connector according to the figure shown below:
insert the load output cable (with its insulation layer stripped according to step 1)
through the waterproof locking cable gland .
Step 3
Connect load output cable as per the following requirements:
Connect the yellow-green wire to the hole labeled "PE", fasten the wire using
an Cross screwdriver;
Connect the brown wire to the hole labeled "L", fasten the wire using an Cross
screwdriver;
Connect the blue wire to the hole labeled "N", fasten the wire using an Cross
screwdriver.
Step 4
Insert the load connector and hear "click", then tighten the waterproof
nut at the instantaneous value, as shown in the figure below, to ensure that the cable
is firmly connected.
Step 5
Connect the connected load connector to the load connector of the
inverter. Turn the ac connector knob to lock until you hear a "click" and the clasp is
in place.
Removing the load connector
Hold the button to unlock and rotate the
knob counterclockwise to the unlock position, then pull out the load connector,the
following figure
⑦
,
Make sure the grid is disconnected before removing the load
connector .
Fig.4-4 Grid connection
A
B
A:15~25mm
B:6~8mm
①
②
Содержание HYD 3000-EP
Страница 1: ...Shenzhen SOFARSOLAR Co Ltd Energy storage integrated inverter Product Model HYD 3K 6K EP User manual ...
Страница 13: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 8 ...
Страница 21: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 16 ...
Страница 36: ...HYD 3K 6K EP User manual Copyright Shenzhen SOFARSOLAR Co Ltd 31 Fig 4 15 Electrical connections Plan A CT ...