NETYS RT Hot Swap 7 - 11 kVA - 551574B - SOCOMEC
37
EN
6.2. Tower Mounting
Use the included tower stands to mount the UPS in an upright tower position by
following the steps below.
1 Assemble the tower stands and the tower stand expanders
1
according to the
size of the UPS (see
Figure 6-3
&
Figure 6-4)
.
Tower Stand
× 4 PCS
Tower Stand
Expander × 4 PCS
Tower Stand
× 4 PCS
Tower Stand
Expander × 6 PCS
(Figure 6-3: Assemble the Tower
Stands for 7 kVA UPS)
(Figure 6-4: Assemble the Tower
Stands for 11 kVA UPS)
2 Pull out the two panels
2
, rotate them 90° clockwise
3
and re-insert them
(see
Figure 6-5
).
(Figure 6-5: Rotate the Two Panels and Two Socomec Logo Nameplates)
S
S
N
e
TYS
RT
ESC
3
2
2